top of page

Installing the Solar Assembly

1. Remove the threaded screw cap at the top of the solar assembly body.

2. Remove the top section of the survey rod and pass it through the solar assembly body. 

 

3. Reinstall the threaded cap and reinstall the survey rod. 

4. Remove the screw cap from the end of each solar arm and screw the threaded stud firmly to the solar panel, using the hole located closest to the power cable. Repeat for all three solar panels.

 

5. Connect the power supply cable for each solar panel. 

 

6. Install the GNSS sensor on top of the survey rod.

7. Connect the power supply cable to the power supply port located on the right side of the sensor.

Need help? Contact support@intellibuoy.com.

Copyright 2026 IntelliBuoy, LLC

© 2035 by Autono. Powered and secured by Wix

  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page